Work Cost
To calculate the total project cost you need to specify the
cost of separate project items (human and material resources). Then, basing
on the data and amount of time (necessary to complete each task) the needed
calculations are done. The cost of both any part of the project and any resource(s)
can be calculated.
For successful project completion we need to define expenses as precisely as
possible. ConceptDraw Project allows to control expenses on any task and
any resource, which will help to define the project cost with maximum accuracy.
Resource cost
Cost of resources is specified in dialog Resource. Cost of
human resource is specified per 1 working day, material resource – per a unit
(for instance, an item or a weight unit).
Dialog is called by one of the following steps:
- Use Edit Resource in menu Workspace.
- Use button Edit Resource
on the toolbar Workspace.
In the line Cost, in the left field a resource cost is specified
per a unit (selected with the help of the arrows or entered manually), in the
right – units: hours, days, weeks or months.
Closing the dialog, do not forget to press OK, to save changes.
Task: Call the dialog and specify the resource cost:
Organizer – $50 / a day
Administrator – $50 / a day
Accountant – $45 / a day
Foods – $0.20
Tents – $70
Equipment – $5
Besides, the cost can be specified in the document itself, in the resource
list mode. For this you need to:
- Select the needed cell.
- Activate edit mode (double-click on the cell).
- Enter the needed value with the help of the arrows on the right or manually.
Task: Enter the following data into the document:
Assistant 1 – $40 / day
Assistant 2 – $40 / day
Transport – $10
Baseline and Real task costs
Cost of task is specified in dialog Task Information, on tab
General, in section Costs. In field Baseline
expected task cost is specified; in field Total the program
derives the real task cost.
Baseline
Dialog Task Information with open tab General
can be called by one of the following steps (do not forget to select the task
first):
- Use Task Information in menu Tasks.
- Use button Task Information
on the toolbar Tasks.
- Call the task context menu and use Task Information.
Task: Specify the expected cost of the task "Buy food"
$120.
Closing the dialog, do not forget to press OK, to save changes.
Real cost
Cost is calculated basing on the cost of the resources involved:
For human resources the cost of the employee’s work per one unit (day, for
example) is multiplied by the number of units, at that, the occupancy degree
in other projects is considered.
For instance, if a doer is occupied with the given task 2 working hours a day
out of 8, then at his cost $40.00 per day for completion of the task he is given
$10.00 (8/2 = 40.00/10.00).
For material resources, the cost of 1 unit is multiplied by the number of units,
used for completing the given task. For instance, the cost of 1 trip by the
transport is $10.00. For the task "Buy food" we need 2 trips: to go
for food on the first and on the second day. On assigning a resource in dialog
Task Information in the field Units the number
of resource units is specified, in our example – 2. Basing on this data the
program will derive real cost of the task.
Task:
Call dialog Task Information with open tab Resources.
(menu Task / Assign Resources to Task) for
the task "Buy food" and in the field Units; for
resources Assistant 1 and Assistant 2 specify the occupancy
degree 20%, for resource Transportation – the number of trips 2,
Foods – 300 units. Press Apply.
In dialog Task Information switch to tab General
to see the real cost. On the program’s calculations it makes $112.
Currency display settings
In the program currency symbol setting can be done for the whole document:
currency symbol, location of figures, denoting cost – before the defining symbol
or after it and the number of decimal digits.
All these settings can be done in dialog Workspace Properties
on tab General.
This dialog can be called by one of the following steps:
- Use Workspace Properties in menu Workspase.
- Use button Workspace Properties
on
the toolbar Workspace.
In both cases dialog Workspace Properties will open with open
tab General.
In this dialog the following parameters are set:
- Currency Symbol – currency type
- Currency Position – currency symbol location: before or
after the figures
- Decimal Digits- the number of decimal digits
The other parameter is not connected with the currency settings.
Closing the dialog, do not forget to press OK, to save changes.
Task: Call dialog Workspace Properties with open
tab General and set currency format in accordance with your
national currency.
Resume: So, in this Lesson we have learned how to edit chart, work
with calendar, assign milestones and deadlines, define the degree of task completion,
task cost and work with resources. Now, let’s move to the next Lesson, where
we will learn about different ways of converting and sharing of our document.